THE PROCESS OF BUILDING A BAMBOO HOME

Building a home is an exciting journey, and understanding the process can make it even smoother. As the architect and manufacturer of your bamboo home, we take care of every detail—from design and building permits to site visits, prefab assembly, and shipping. We’re also here to help you choose the perfect contractor to bring your vision to life.

HOW TO BUILD A BAMBOO LIVING HOME FROM START TO FINISH:

STEP 1

TELL US ABOUT YOUR PROJECT:

1. WHERE ARE YOU LOCATED?
2. DO YOU HAVE LAND?
3. WHAT'S YOUR BUDGET?
4. WHICH MODEL INTERESTS YOU?
5. WHAT'S YOUR TIMELINE?

We’ll guide you through the steps to becoming a Bamboo Living homeowner—from design and permitting to construction—while providing estimated costs and timelines tailored to your project. Once you provide the necessary details, we can follow up with drawings, photos, videos, and a general build cost estimate to help you make informed decisions.

If possible, we’d love to meet you in person at our Pahoa showroom. Please call ahead to schedule your visit, so we can ensure a personalized meeting.

STEP 2

SECURE PROPERTY & ESTABLISH YOUR BUDGET

Finding the right piece of land to build on is an essential part of creating your new dream home. We design our homes to blend and respond to their environment whether it’s on oceanfront property, a sunny hillside, a tropical valley, or high in the mountains.

We can look at a total budget for the project and help review general costs of construction to help you select the right design for your Bamboo home.

STEP 3

CHOOSE A MODEL

Now that you have your land and have established a budget, choose the bamboo home model that best fits your needs. We can help you select the right design for you based on budget, square footage, use, bedrooms, aesthetic, and efficiency.

BROWSE ALL OF OUR HOME MODELS

Aside from the model type, we offer single wall construction (with structural bamboo wall panels that are included in the building kit) or double wall construction (with conventionally framed walls that are NOT included in the building kit) as options. Your choice between these two options will depend on the location of your site.

TO LEARN MORE, SEE OUR BUILDING KIT DETAILS.

STEP 4

ARRANGE A SITE VISIT WITH ONE OF OUR ARCHITECTS

You have an idea of what you want to create, and scheduling a site visit with one of our architects will help you unlock the full potential of your home and property.

We’ll work with you regarding your land and local requirements so you’ll be in good hands when we secure your building permits.

STEP 5

SIGN YOUR BAMBOO LIVING CONTRACTS AND PLACE YOUR DEPOSIT

With your deposit in place, we schedule the production of your bamboo home package at our factory in Vietnam and begin design and construction drawings. During the design process, you have the ability to collaborate with our architects and designers to create a home that fits your lifestyle and personal design taste. Once we have your approval on the preliminary design drawings, the final plans are drawn up and submitted for building permit if required. If your land is in the State of Hawai'i we’ll file your permits with the county office.

For those outside of Hawai'i, we will work with a local architect or project manager to secure building permits.

STEP 6

HIRE YOUR PROJECT MANAGER OR GENERAL CONTRACTOR

We have a list of recommended project managers and general contractors to be your builder in this process. For those located outside of Hawai'i, experienced assembly technicians will act as a consultant to guide an efficient assembly process with your local builder. The typical assembly time on-site is between 1-7 days for our standard models.

Since Bamboo Living homes have been designed to integrate with traditional construction, an experienced builder will be able to complete the rest of your home after the prefabricated kit is assembled.

STEP 7

CHOOSE YOUR FINISHES, MATERIALS, & APPLIANCES WITH YOUR BUILDER

In addition to what’s included with your bamboo home package, you’ll need to select your foundation type, flooring, roofing, windows, doors, counters, cabinets, fixtures, and appliances. This is the time to work with your builder to decide what finishes and materials you’ll need to complete your home. As designers, we can offer guidance during this selection process.

STEP 8

START YOUR SITE WORK

Now is the time for the builder to prepare your site and build the foundation for your new home. Our single wall construction models require the foundation to be completed for bamboo assembly to begin. Our double wall construction models require the foundation and perimeter load-bearing walls to be completed for bamboo assembly to begin.

It’s important for you to determine the accessibility of either a 20’ or 40’ container to your site. In the case where access is an issue, smaller trucks can haul panels to the site.

STEP 9

YOUR HOME SHIPS!

We’ve been busy building your home at our factory, and it’s now on the way to you! Our experienced and skilled bamboo artisans have handpicked poles, carved complex joints, integrated custom steel hardware, and assembled your entire home package in a matter of months.

After sending you the final photos of your expertly crafted bamboo structure, our team packs all of the parts and panels into shipping containers for departure.

Shipping to Hawai'i typically takes about 5 weeks. If shipping elsewhere, we will provide you an estimated arrival from the shipping company.

STEP 10

ASSEMBLE YOUR BAMBOO LIVING BUILDING KIT

Each component of your home has been labeled and fits together like a large, well-crafted piece of furniture. Because your home has been pre-built and disassembled, you can be sure that all the pieces join up just right.

When the assembly is complete, one of our architects will come and check to see that your bamboo kit has been assembled correctly.

Assembly is very quick, between 1-7 days for most building types.

STEP 11

FINISH THE HOUSE

You’ve just assembled your Bamboo Living building kit and now it’s time to finish your dream home. This is the time to install your roofing and complete the interior of your home.

As your architect, we are always available to support your builder during the construction process by providing clarifications and information.

STEP 12

MOVE IN & ENJOY!

It’s been an incredible journey and you are now the proud owner of a beautiful Bamboo Living home! As we’ve learned from our customers, owning a bamboo home is a rewarding experience and it’s likely you’ll receive some well-deserved attention from friends and neighbors.

Your new home is a unique work of art, and people will notice! Now it’s time to relax and share the beauty of your home with those you love. ENJOY!

FREQUENTLY ASKED QUESTIONS

COSTS

CERTIFICATIONS & PERMITTING

SHIPPING

ASSEMBLY & STRUCTURE

QUALITY

MISCELLANEOUS

STILL HAVE QUESTIONS?

Feel free to contact us and we’ll be happy to help! Our office/showroom is open Monday-Friday
11:00 AM - 5:00 PM HST, and we can be reached during those hours at 808-359-3359.

CONTACT US